Coastal Clear-Span Warehouse
- Size
- 7,500 sq ft
- Timeline
- 10 weeks
- Region
- Coastal Bend
- Cost range
- $190K–$220K
Challenge
Owner needed a high-clearance warehouse for trailer staging on a coastal site with strict wind-load engineering requirements.
SSG's solution
Single-source design-build with site-specific ASCE 7 wind speed engineering, salt-air-spec coatings, and a clear-span frame that left the floor column-free for trailer maneuvering.
Firm bid up front, one PM through the whole job. The number we signed was the number we paid.